Zhejiang Chunming Waterproof Material Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Shen Yong
  • Company Name : Zhejiang Chunming Waterproof Material Co., Ltd.
  • Tel : 86-0573-86406060
  • Fax : 86-0573-86406068
  • Address : Zhejiang,Jiaxing,Haiyan Qinshan Fengshan Industrial Park
  • Country/Region : China
  • Zip : 314400

polymer modified cementitious(FJS)waterproof coating

polymer modified cementitious(FJS)waterproof coating
Product Detailed
1.Two-component polymer 2.Anti-corrosion, anti-aging 3.Environment-friendly 4.High and low temperature 5.Good adhesion

    polymer modified cementitious(FJS)waterproof coating

 

Characteristic

a) High adaptability to wet and dry base layer, not flowing on elevation.

b) Pigment can be added as you wish.

c) High elasticity and high durability.

d) Poison-free and odor-free, no pollution, easy construction short in construction time.

e) Ventilation property, no bulking even on wet base layer.

 

Applicable scope

 This product applies to masonry, mortar, concrete, mal, wood, hard plastic, glass, plasterboard, foam board, asphalt, rubber, SBS, APP, polyurethane and civil construction(such as building, wall surface, subsurface, tunnel, bridge, pool, reservoir, bathroom and kitchen)

 

Performance

No.

Test

Preformance

I

II

1

Solid content/%

70

70

2

Tension strength no processing/MPa ≥

1.2

1.8

3

Fracture elongation no processing/% ≥

200

80

4

Low temperature flexibility

-10°C no crack

-

5

Adhesion strength

no processing/MPa ≥

0.5

0.7

6

Impermeability (0.3MPa,30min)

Watertight

7

Anti-permeability(dorsal surface)   ≥

-

0.6

      

 

Construction requirements

—Liquid material : powder material  8:12(weight)

—Construction temperature should be above 0°C

—Open-air project avoid rainy days or avoid construct on base surface with water

—Do not do second coating until the first coating is dry

—The construction of protective layer or decorative layer should be done only after the first coating is dry

 

Matters needing attention

1.Ingredients to accurate metering, mixing evenly, use should not add water.

2.Construction of the temperature should be above 0 degree, under negative temperature construction shall take the necessary freezing measures.

3,Waterproof coating is now with the current use, and used it within four hours.

polymer modified cementitious(FJS)waterproof coating



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.